Location
Anaheim I

BUILT TO NVIDIA REFERENCE ARCHITECTURE STANDARDS
Eagle Mountain Data’s OC 1 facility in Anaheim, California, is a purpose-built AI factory exclusively engineered for NVIDIA GB300 NVL72 deployments. Serving as the anchor for a 45 MW multi-site regional expansion, OC 1 delivers uncompromised 135 kW per-rack density and day-zero liquid cooling deployment velocity.
Designed for hyperscale deployments, the facility provides dedicated infrastructure for AI training and inference. OC 1 bypasses legacy constraints to offer 100% green utility power, zero-water cooling, and direct interconnection to cloud providers including AWS and Microsoft Azure. It combines scalable power capacity and high density infrastructure to seamlessly support high-performance workloads.
- 135 kW NVL72 Architecture: Purpose-built exclusively for NVIDIA GB300 deployments.
- "Day-Zero" Deployment: Pre-plumbed liquid cooling with Quick Disconnects (QDs) for instant, zero-hot-work installation.
- 45 MW Regional Scalability: The anchor site for a massive, multi-facility Southern California expansion.
- Next-Gen Ready (200 kW+): Cooling infrastructure preengineered to support future Vera Rubin architectures.
- Zero-Compromise ESG: Targeting < 1.15 PUE and 0.0 WUE, with 100% green utility power available.
- Tier 1 AI Connectivity: Carrier-neutral ecosystem featuringdirect on-ramps to AWS Direct Connect and AzureExpressRoute.
Join the Allocation Waitlist
Get notified the moment new megawatts or GB300 clusters come online
Get on the List